  • We need to be careful about new features. We need to cleanup and refactor the current codebase, improve performance and deployability, and then we can implement features as required. But this really should be driven by our users. In the meantime, new feature requests will be stored in this milestone.

    No due date
    1/12 issues closed
  • There are a number of simple changes that can be made to the application for speed improvements and server load improvements. These include database optimizations, which require introspection of db queries on a per-view basis. These will be important as we scale up. No due date is set, but the projection is to do these between the start of the spring semester and before mid-terms.

    No due date
    0/6 issues closed
  • The things we will do immediately after the New Theme round of changes

    No due date
    5/26 issues closed
  • Overdue by 13 year(s)
    Due by December 12, 2012
    31/34 issues closed
  • Overdue by 13 year(s)
    Due by January 20, 2013
    4/20 issues closed