You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Add opt-in DAG-parallel target execution. The dependency graph already encodes what can run concurrently; the engine just doesn't exploit it. Default stays sequential.
Findings (file:line)
BuildExecutor.cs:42 — execution is a serial ExecutionPlan.ForEach(...).
Fallout.Core/Planning/TopoSort.cs:93-107 — independent nodes are detected per step but only used to flag ambiguity in strict mode; output is a flat linear order, not parallel waves.
Partition is CI-machine sharding, not intra-build parallelism — distinct feature.
Scope
Have TopoSort expose ready-sets / waves (nodes whose dependencies are satisfied).
Replace the serial loop with a bounded concurrent scheduler honoring DependencyBehavior, ProceedAfterFailure, AssuredAfterFailure.
Gate behind --parallel[=N], default off.
Acceptance criteria
Independent targets run concurrently when the flag is set.
Serial execution remains the default and is behavior-identical to today.
Failure/skip/assured-cleanup semantics preserved under parallelism.
Notes
Non-breaking (opt-in flag).
Depends on: FT-3, FT-4, FT-5, FT-6 (de-statification + thread-safe logging must land first).
Activity
[-]FT-8: Opt-in DAG-parallel target execution[/-][+][Foundation] FT-8: Opt-in DAG-parallel target execution[/+]