-
Notifications
You must be signed in to change notification settings - Fork 3
Open
Labels
machine: DIII-DRelated to the DIII-D tokamakRelated to the DIII-D tokamak
Description
From communications with Jayson Barr and Kurt Holtrop:
I remember that a while back we made the switch in epsoff signal to be high=good and 0=bad. How can we figure out what day / shot that changed?
...
The wiring was changed during the 2023/2024 vent so between the last plasma shot of 2023 and the first power supply test shot of 2024.
The last plasma shot on 6/29/23 was 196645. (pre-change)
The first low power supply test shot of 2024 was 198183 on 4/24/24. (post-change)
Affected physics methods:
- get_ip_parameters
- get_rt_ip_parameters
Reactions are currently unavailable
Metadata
Metadata
Assignees
Labels
machine: DIII-DRelated to the DIII-D tokamakRelated to the DIII-D tokamak