Project #3: one status per piece of work #122

Open

Description

@andersalm

Owner: Irzhy (@irzhywau). Part of #93.

Goal: Project #3 shows the work as issues, each with one status, so everyone takes the next issue in order.

Done on 2 October: 83 PR cards removed from the board, the 17 missing open issues added, and statuses corrected (#44-#47 and #98 back to Backlog; issues whose PR is ready are in QA / Review). PRs on retired bases were triaged; #63 and #64 are closed.
Done on 7 October: the last 7 PR cards removed (#123, #148, #203-#206, #266) and the missing open issues #260, #264 (Backlog) and #265 (In progress, per Sasha's 6 Oct comment) added.

Done means

Browser hierarchy and status proof — 2026-10-08

Native hierarchy: #283 → #87 → #131/#288, and #283 → #289/#290/#291/#292/#293. Project #3 contains one issue item per new task, all assigned to andersalm, with #288 in 0.8.0 and #289–#293 in After 0.8.0. #131 is the one active installed Browser task. Accepted producer milestones unblock integration; full issue acceptance stays open. This bounded update leaves the broader view/ref/board cleanup gates above with their owners.

Local AI plan reconciliation — 2026-10-08

Local AI reconciliation retains one project issue card per existing task under #84 (#94–#105), with #94–#96 Done, #97–#105 Backlog and #150 In progress. #85 is corrected from QA / Review to Backlog: its parked #148 is draft/conflicting with no reviewer request. Its exact historical proof and remaining acceptance stay in the issue. Native core/update milestone dependencies are preserved; no new issue or PR card is needed. Conditional estimates live in #84 while start/target dates remain unset.

Activity

  1. added this to the 0.7.1 milestone on Sep 29, 2026
  2. andersalm commented on Oct 7, 2026

    @andersalm
    ContributorAuthor

    Owners set for every unassigned 0.8.0 issue from recorded ownership: Irzhy owns the isolation design and attack suite (#172, #180, per #173), Chat follow-ups (#260, #264) and Marketplace (#130); Sasha owns the installer presentation (#252, per #88); Anders owns the rest as product owner. Change any by reassigning.

  3. modified the milestones: 0.8.0, After 0.8.0 on Oct 12, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

No labels
No labels

Type

No type

Projects

No projects

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions