Skip to content

[Task]: run the reviewing-before-merge matrix under the new gate and post the result on #451 to unblock PR #653 #665

Closed

Description

@sumithr

Priority / sequencing

P1 / priority: next

Roadmap fields

Status: Ready; Priority: P1; Size: S; Order: 2; Depends on: none. Parent epic: #660. External: PR #653 / #451.

Problem

Slice 5 of epic #660, and the reason the epic is urgent. PR #653 (issue #451, splitting sumo-qa-reviewing-before-merge into a compact root and lazy modules) has an acceptance criterion requiring the reviewing-before-merge eval matrix to pass. That criterion was left UNVERIFIED because every call to the old gate returned HTTP 429 credit_balance_exhausted across three consecutive days. PR #653 has been held open and unmerged ever since, pending this epic.

Once #679 lands the Claude backend (npm run eval:claude), that matrix can finally be run, and its result posted where it unblocks the merge.

Expected outcome

Scope

Acceptance criteria

Test plan

The run itself is the test. Sanity-check first with the runner's dry-run over the 28 configs to confirm assembly against #653's branch, then the real graded run.

Context

Activity

  1. added
    enhancement
    priority: next
    on Sep 9, 2026
  2. sumithr commented on Sep 25, 2026

    @sumithr
    OwnerAuthor

    Closing as completed. The reviewing-before-merge matrix ran under the Claude gate (28 configs, 92 cases, 90 passed, 0 provider or judge errors, about 1.3M tokens, $3.99 notional list price) against PR #653's tree, and the result is posted on #451: #451 (comment). #451's AC6 is verified and PR #653 merged on 2026-09-25 as 2ec3f46.

    One criterion is handed over, not met here: "all 7 reviewing-before-merge .ab controls hold their A0-fail / A1-pass contract". Seven controls did not separate in this run (adversarial.ab, reviewing-before-merge.ab, eval-validity.ab, feature-flow.ab, feedback-memory.ab, fence-parser.ab, runtime-scope.ab); their control legs read no skill or a frozen PRE snapshot byte-identical to main, so the split did not cause it. That criterion is owned by #685, whose scope is updated with these results.

  3. sumithr commented on Sep 25, 2026

    @sumithr
    OwnerAuthor

    The reviewing-before-merge matrix ran once on the Claude gate. The full result is posted on #451: #451 (comment)

    Not met here: the criterion that all 7 .ab controls hold A0-fail / A1-pass. On the Claude pair, 7 of the 9 .ab controls do not separate, because their control legs pass. Those legs never read #653's skill. That is #685's scope, and the per-leg counts are in the #451 comment for #685 to reuse as its "before" evidence.

    Reports: the per-config promptfoo JSON reports are retained on the maintainer's machine, outside the repo, because tests/evals/results/ is gitignored.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    ai-taskenhancementpriority: nexttooling

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions